Layouts / UP Evanston Sub
UP Evanston Sub
Superintendent: Daryl Kruse
Represents the Union Pacific Evanston Subdivision from Peru, Wyoming to Ogden, UT. Modern double-track railroading through western mountain scenery including Echo Canyon and Weber River Canyon. Long trains with DPUs through curves, control points, tunnels, and bridges.
Photos
Railroad Details
- Superintendent
- Daryl Kruse
- Locale
- Western Wyoming and northwestern Utah
- Scale
- HO
- Era
- 2019
- Layout Size
- 2200 square feet
- Control System
- ESU ECoS/RailCom; JMRI LocoNet turnouts and signals; JMRI CATS dispatch panel (CTC)
- Scale Clock
- None
- Session Length
- 3–4 hours
- Crew Size
- 10–14
- Listed Jobs
- Road crews; Evanston yard; Westvaco mine and plant; Holcim cement; UTLX; dispatcher; assistant dispatcher
Location Details
- Accessibility
- Basement via stairs
- Pets
- None
- Distance from Hotel
- 47 miles, ~1 hour
Session Notes
YouTube: https://www.youtube.com/@EvanstonSub